S.N.ProjectDistrictDept.A/F ₹ (lakh)StatusProject TypeConstruction Type
1Construction of ACB Building Jhalana, JaipurJaipurACB389.32Handed overAdministrativeNew
2Police station Dantaramgarh, SikarSikarPolice228.48Handed overAdministrativeNew
3Police station Bhoopal sagar, ChittoregarhChittoregarhPolice212.80Handed overAdministrativeNew
4Construction of Police station Nagauri Gate, Jodhpur CommissionerateJodhpurPolice273.40Handed overAdministrativeNew
5Ploice thana Kotwali, Fathepur, SikarSikarPolice229.16Handed overAdministrativeNew
6Construction of Police station Piplu, TonkTonkPolice228.42Handed overAdministrativeNew
7Construction of Police station BawalwaraUdaipurPolice228.53 Handed overAdministrativeNew
8Construction of Police station Mundwa, NagaurNagaurPolice208.52 Handed overAdministrativeNew
9Construction of Police station Damotar, PratapgarhPratapgarhPolice248.50Handed overAdministrativeNew
10Construction of Police station Pipalkhoont, PratapgarhPratapgarhPolice240.89 Handed overAdministrativeNew
11Construction of Police station Kuwariya, RajsamandRajsamandPolice232.24 Handed overAdministrativeNew
12Construction of Police station Semari, UdaipurUdaipurPolice254.40 Handed overAdministrativeNew
13Construction of Police station Jawahar circle, Jaipur CommissionerateJaipurPolice216.19 Handed overAdministrativeNew
14Construction of a storage house for storing confiscated narcotics under the NDPS Act in Kota.KotaNDPS27.34Handed overOtherNew
15Construction of C.O. Office Bilada, JodhpurJodhpurPolice66.86Handed overAdministrativeNew
16Construction of C.O. Office LakshmangarhSikarPolice41.00 Handed overAdministrativeNew
17Construction of C.O. Office TonkTonkPolice47.65Handed overAdministrativeNew
18Administrative building in SDRF (office, MT, workshop, store, garage, guardroom, Koth and others)Jaipur RuralSDRF272.5Handed overAdministrative New
Construction of Jawan Mess Bhawan (Kitchen) in SDRF Gadota.Jaipur RuralSDRF117.5Handed overAdministrative New
Construction of Officers Mess (Kitchen) in SDRF Gadota.Jaipur RuralSDRF130Handed overAdministrative New
Construction of communication block in SDRF Gadota.Jaipur RuralSDRF75Handed overAdministrative New
Construction of Company and Team Office Block in SDRF Gadota.Jaipur RuralSDRF60Handed overAdministrative New
Construction of entrance and reception room in SDRF Gadota.Jaipur RuralSDRF20Handed overAdministrative New
19Construction of LSQ+USQ (20 Houses) at RPL Jaipur (Rural)JaipurPolice467.04 Handed overResidentialNew
20Residence of Commandant / Assistant Commandant 7th Battalion RAC BharatpurBharatpurRAC100.00Handed overResidentialNew
21Construction of Police station Jahajpur, BhilwaraBhilwaraPolice 225.69Handed OverAdministrative New
22Construction of Police station GudhaJhunjhunuPolice 236.00Handed overAdministrative New
23Construction of Police station SurpaliaNagaurPolice 250.20Handed overAdministrative New
24Construction of Police station Anandpur kaluPaliPolice 233.83Handed overAdministrative New
25Construction of Police station ParoliBhilwaraPolice 225.69Handed OverAdministrative New
26Construction of Police station MangropBhilwaraPolice 225.69Handed OverAdministrative New
27Construction of Police station GhasaUdaipurPolice 254.40Handed over Administrative New
28Construction of Police station Tunga, Police Commissionerate, JaipurJaipurPolice 252.48Handed over Administrative New
29Construction of Administrative building, 14th Battalion RAC PahadiBharatpurRAC424.23Handed OverAdministrative New
30Construction of Water harvesting system in SDRFJaipurSDRF10.00Handed OverOtherNew
31Construction of various administrative buildings for MP(IR) BN, PratapgarhPratapgarhRAC1842.94Handed OverAdministrative New
32Construction of various administrative buildings for Police Training School, UdaipurUdaipurPolice1776.46Under ConstructionAdministrative New
33Construction of Police station DaanpurBanswara Police231.54Handed OverAdministrative New
34Construction of Additional Superintendent of Police Office Sahada, BhilwaraBhilwaraPolice38.95Handed OverAdministrative New
35Construction of Mahila Police Station DausaDausa Police166.76Handed OverAdministrative New
36Construction of Police Station Kotkhavada, Police Commissionerate, JaipurJaipur Police228.48Handed OverAdministrative New
37Construction of Police station GhantaliPratapgarhPolice230.84Handed OverAdministrative New
38Construction of DSP office NathdwaraRajsamandPolice45.75Handed OverAdministrative New
39Construction of DSP office KumbhalgarhRajsamandPolice37.74Handed OverAdministrative New
40Construction of DSP office Mt. AbuSirohiPolice40.49Not Started YetAdministrative New
41Construction of Police Station Mt. AbuSirohiPolice233.22Handed OverAdministrative New
42Construction of Police station SallopatBanswaraPolice222.09Handed OverAdministrative New
43Construction of Police Station, ShahabadBaranPolice218.88Work CompletedAdministrative New
44Construction of Police Station KotkasimAlwarPolice254.40Handed OverAdministrative New
45Construction of Police Station, Rajgarh, District AlwarAlwarPolice240.96Handed OverAdministrative New
46Construction of Police Station Hamirgarh District BhilwaraBhilwara Police228.83Handed OverAdministrative New
47Construction of SOG Police Station GhatGate, JaipurJaipurPolice219.84Handed OverAdministrative New
Construction of a storage house for storing confiscated narcotics under the NDPS Act in Jhalawar.JhalawarNDPS27.34Handed OverAdministrative New
48Construction of Police Station Sunel, District Jhalawar.JhalawarPolice240.62Under ConstructionAdministrative New
49Construction of Police Station Etawah, District Kota RuralKotaPolice228.13Re-TenderAdministrative New
50Construction of Police Station BudhaditKotaPolice228.13Re-TenderAdministrative New
51Construction of Police Station, KanwasKotaPolice228.13Handed OverAdministrative New
52Construction of Mahila Police Station NagaurNagaurPolice203.31Handed OverAdministrative New
53Construction of Police Station Bagdi NagarPaliPolice233.83Handed OverAdministrative New
54Construction of Police Station Sojat CityPaliPolice233.83Handed OverAdministrative New
55Construction of Police Station Sande RaoPaliPolice236.23Handed OverAdministrative New
56Construction of Police Station JaitaranPaliPolice233.83Handed OverAdministrative New
57Construction of Police Station MehandvasTonkPolice250.62Handed OverAdministrative New
58Construction of Administrative Building of Police Station Nagar Fort, District Tonk.TonkPolice250.62Handed OverAdministrative New
59Construction of Administrative Building of Police Station Malpura, District Tonk.TonkPolice250.62Handed OverAdministrative New
60Construction of Administrative Building of Police Station Javada, District Chittorgarh.ChittorgarhPolice240.26Under ConstructionAdministrative New
61Construction of Administrative Building of Police Station Pahadi, District Bharatpur.BharatpurPolice252.48Administrative New
Construction and establishment of drill nursery at RPTC Kishangarh, Ajmer.AjmerPolice12.50Work CompletedAdministrative New
62Construction of Administrative Building of Police Station, Kekadi, District Ajmer.AjmerPolice192.29Handed OverAdministrative New
63Construction of various buildings of Police Training School at Bikaner.BikanerPolice954.38Handed OverAdministrative New
64Construction of various administrative Buildings for MBC at BanswaraBanswaraPolice1809.00Handed OverAdministrative New
65Construction of dispensary building in MBC Banswara.MBC BanswaraPolice81.76Work is closed at present time AdministrativeNew
66 Construction of S.O mess in MBC Banswara.MBC BanswaraPolice68.13Work is closed at present time AdministrativeNew
67Construction of Jawan Mess Building (Kitchen) in MBC Banswara.MBC BanswaraPolice186.26Work is closed at present time AdministrativeNew
68 Construction work of covered parking with garage at MBC BanswaraMBC BanswaraPolice35.97AdministrativeNew
69Construction of Indoor School in Bikaner (11 Rooms) Ground Floor, First Floor and Second Floor,Police Training School Bikaner.BikanerPolice457.88Handed OverAdministrativeNew
70Construction of Jawan Mess Building in Police Training School Bikaner
BikanerPolice207.47Handed OverAdministrativeNew
71 Construction work of toilet and changing room along with parade ground in Police Training School, Bikaner.BikanerPolice78.43Handed OverAdministrativeNew
72Construction work of pumping station and underground water tank for water supply line in Police Training School, Bikaner.BikanerPolice69.83Handed OverAdministrativeNew
73Tube well and water tank (capacity 1.5 lakh liters) in Police Training School, Bikaner.BikanerPolice40.22Handed OverAdministrativeNew
74Electricity line (5 km 11 KV) and 11 KV Substation and solar power in Police Training School Bikaner. BikanerPolice100.55Handed OverAdministrativeNew
75Construction of administrative building (Commandant/Deputy Commandant/Assistant Commandant/Company Commanders office) Koth, store and armor shop ground floor and first floor in MBC Banswara.MBC BanswaraPolice779.41Work is closed at present time.AdministrativeNew
76Construction Work of Office/M.T. Workshop/M.T. Building a storein MBC Banswara.MBC BanswaraPolice107.45Work is closed at present time.AdministrativeNew
77Construction Work of Sewer Line and Sewerage Treatment Plant at MBC Banswara.MBC BanswaraPolice57.37AdministrativeNew
78Development of Water Supply Source at MBC BanswaraMBC BanswaraPolice45.35AdministrativeNew
79Construction Work of Tube Well and Water Tank at MBC Banswara.MBC BanswaraPolice40.82AdministrativeNew
80Construction Work of PlayGround at MBC Banswara.MBC BanswaraPolice36.85AdministrativeNew
81Construction Work of Boundary wall at MBC Banswara.MBC BanswaraPolice137.2CompletedAdministrativeNew
82Construction Work of Santary Post and Reception Room at MBC Banswara.MBC BanswaraPolice39.3Work is closed at present time AdministrativeNew
83Construction Work of Canteen and Trademan Shop(5 Shop)at MBC Banswara.MBC BanswaraPolice20.62Work is closed at present time AdministrativeNew
84Construction Work of Entry gate at MBC Banswara.MBC BanswaraPolice25.1Work is closed at present time AdministrativeNew
85High mask light work in MBC Banswara.MBC BanswaraPolice17.01Work is closed at present time AdministrativeNew
86Street Lighting work in MBC Banswara.MBC BanswaraPolice34.02Work is closed at present time AdministrativeNew
87Electricity Line (5Km 11KV) and 33 KV in MBC Banswara.MBC BanswaraPolice96.38Work is closed at present time AdministrativeNew
Construction work of Police Station Ghatol Banswara.BanswaraPolice343.89Work Order IssuedAdministrativeNew
Construction work of Police Station Khamera District Baswada.BanswaraPolice343.89Work Order IssuedAdministrativeNew
88Constraction work of 2 Tubewells (40 Lakh capacity) CWR and Pipe Lines etc.in PTS Alwar.AlwarPolice87.67Work is closed at present time AdministrativeNew
89Constraction work of Over Head tank for water supply in Police Telecom Housing Complex,Jaipur.JaipurPolice203.45Under ConstructionAdministrativeNew
90Constraction work of Aproch Road in reserve police Line Bhiwadi Alwar.AlwarPHED69.62Work is closed at present time AdministrativeNew
91Constraction work of Water Storage Tank in 10thBN RAC Bikaner.BikanerPolice18.87Handed OverAdministrativeNew
92Constraction work of Over Head water tank and digging of Tubewell inpolice Line Dungarpur.DungarpurPolice149.95Under ConstructionAdministrativeNew
93Constraction work of Water tank for Drinking water System in police Line Pratapgarh.PratapgarhPolice49.1Under ConstructionAdministrativeNew
94Constraction work of Administrative Building of Police Station Bhakrota Police commissionnerate Jaipur.Jaipur CPPolice340Work is closed at present time AdministrativeNew
95Constraction work of Superintendent Of Police Administrative Building in reserve police Line Bhiwadi Alwar.AlwarPolice816.71Work is closed at present time AdministrativeNew
96Constraction work of Administrative Building in reserve police Line Bhiwadi Alwar.AlwarPolice745Work is closed at present time AdministrativeNew
97Constraction work of Parade Ground and Sports ground in reserve police Line Bhiwadi Alwar.AlwarPolice150Work is closed at present time AdministrativeNew
98Constraction work of Electrical Sub station road light and High mask light in reserve police Line Bhiwadi Alwar.AlwarPolice61.5Work is closed at present time AdministrativeNew
99Constraction work of Solar Plant Road in reserve police Line Bhiwadi Alwar.AlwarPolice61.23Work is closed at present time AdministrativeNew
100Constraction work of Over Head Tank in reserve police Line Bhiwadi Alwar.AlwarPolice54.43Work is closed at present time AdministrativeNew
101Constraction work of District control Room in reserve police Line Bhiwadi Alwar.AlwarPolice67.97Under ConstructionAdministrativeNew
102Constraction work of Water harvesting System in Reserve police Line Bhiwadi Alwar.AlwarPolice19.84Work is closed at present time AdministrativeNew
103Constraction work of SewerageTreatment System in Reserve police Line Bhiwadi Alwar.AlwarPolice100.63Work is closed at present time AdministrativeNew
104Constraction work of Aproch Road in reserve police Line Bhiwadi Alwar.AlwarPolice294.8Work is closed at present time AdministrativeNew
105Constraction work of Boundary wall in Reserve police Line Bhiwadi Alwar.AlwarPolice287.7Under ConstructionAdministrativeNew
Construction work of Police Station Mamachari Karauli.KarauliPolice343.89Under ConstructionAdministrativeNew
Construction work of Police Station Cyber ​​Thana Karauli.KarauliPolice250Under ConstructionAdministrativeNew
Construction of 200 capacity male barrack in Reserve Police Line Bhiwadi.AlwarPolice990Under ConstructionResidentialNew
Construction of women barrack with a capacity of 50 in Reserve Police Line Bhiwadi.AlwarPolice311Under ConstructionResidentialNew
Construction of Jawan Mess in Reserve Police Line Bhiwadi.AlwarPolice199ResidentialNew
106Constraction work of Adminstrative Building at police Station Malsisar Jhunjhunu. JhunjhunuPolice360Under ConstructionAdministrativeNew
107Constraction work of Adminstrative Building at police Station Surajgarh Jhunjhunu. JhunjhunuPolice360Under ConstructionAdministrativeNew
108Constraction work of Adminstrative Building at police Station Lakhanpur Bharatpur. BharatpurPolice360AdministrativeNew
109Constraction work of Adminstrative Building at police Station Gajner Bikaner. BikanerPolice360Under ConstructionAdministrativeNew
110Constraction work of Adminstrative Building at police Station Savina Udaipur. UdaipurPolice360 work order will be issued.AdministrativeNew
111Constraction work of Adminstrative Building at police Station Karni Vihar Jaipur CP. Jaipur CPPolice360Work is closed at present time AdministrativeNew
112Constraction work of Adminstrative Building at police Station Kotwali Churu. ChuruPolice360HandoverAdministrativeNew
113Constraction work of Adminstrative Building at police Station Shapura Jaipur. JaipurPolice360HandoverAdministrativeNew
114Constraction work of Adminstrative Building at police Station Govindgarh Alwar. AlwarPolice360Work is closed at present time AdministrativeNew
115Constraction work of Adminstrative Building at police Station Pilwa Nagaur. NagaurPolice360AdministrativeNew
116Constraction work of Adminstrative Building at police Station Bijoliya Bhilwara. BhilwaraPolice360Work Not Start YetAdministrativeNew
117Constraction work of Adminstrative Building at police Station Shivganj Sirohi. SirohiPolice360Work completed AdministrativeNew
118Constraction work of Adminstrative Building at police Station Anadara Sirohi. SirohiPolice360Work is closed at present time AdministrativeNew
119Constraction work of Adminstrative Building at police Station Mandar Sirohi. SirohiPolice360Under ConstructionAdministrativeNew
Construction work of Police Station at Sadar Sirohi .SirohiPolice343.89Tenders have been received.AdministrativeNew
Construction work of Police Station Jawal/Javda District Sirohi.SirohiPolice343.89Under ConstructionAdministrativeNew
Construction work of Police Station Cyber ​​Thana Sirohi.SirohiPolice250Work is closed at present time (Due to court stay)AdministrativeNew
120Constraction work of Adminstrative Building at Mahila police Station Kurabad Jhalawar. JhalawarPolice315HandoverAdministrativeNew
Construction work of Police Station Panwada District Jhalawar.JhalawarPolice343.89Work Order IssuedAdministrative
121Constraction work of Adminstrative Building at police Station Kurabad Udaipur. UdaipurPolice360Under ConstructionAdministrativeNew
122Constraction work of Culvert At Police training school Morwania Udaipur. UdaipurPolice232.84Work is closed at present time AdministrativeNew
123Constraction work of Compound wall At Police training school Morwania Udaipur. UdaipurPolice155.99Work is closed at present time AdministrativeNew
124Constraction work of Adminstration indoor school and Plinth Conservation of barracks At Police training school Morwania Udaipur. UdaipurPolice4469.73Work is closed at present time AdministrativeNew
125Constraction work of Adminstrative Building at police Station Pahada Udaipur. UdaipurPolice360Work is closed at present time AdministrativeNew
126Constraction work of Adminstrative Building at police Station Kapasan Chittorgarh. ChittorgarhPolice360Under ConstructionAdministrativeNew
127Constraction work of Adminstrative Building at police Station Begu Chittorgarh. ChittorgarhPolice360Under ConstructionAdministrativeNew
128Constraction work of Adminstrative Building at police Station Bhadsoda Chittorgarh. ChittorgarhPolice360Under ConstructionAdministrativeNew
129Constraction work of Adminstrative Building at police Station Vijaypur Chittorgarh. ChittorgarhPolice360Under ConstructionAdministrativeNew
Construction work of Police Post Delawas, District Chittorgarh.ChittorgarhPolice38Handed OverAdministrativeNew
Construction of Home Guard Training Center Chittorgarh Office at Chittorgarh.ChittorgarhPolice80Handed Over
AdministrativeNew
130Constraction work of Adminstrative Building at police Station Kotwali Dausa. DausaPolice360Under ConstructionAdministrativeNew
131Constraction work of Adminstrative Building at Kasba Thana Baran. BaranPolice360Under ConstructionAdministrativeNew
132Constraction work of Adminstrative Building at police Station Sadar Bazar Jodhpur. JodhpurPolice360Tander to be Issued againAdministrativeNew
133Constraction work of Adminstrative Building at police Station Banad Jodhpur. JodhpurPolice360Under ConstructionAdministrativeNew
134Constraction work of Adminstrative Building at police Station Rajiv Gandhi Nagar Jodhpur. JodhpurPolice360Under ConstructionAdministrativeNew
135Constraction work of Adminstrative Building at police Station Ratanada Jodhpur. JodhpurPolice360Under ConstructionAdministrativeNew
136Constraction work of Reception Room at P.S Charbhuja,kelwada and Khamnore ajsamand. RajsamandPolice7Handed OverAdministrativeNew
137Constraction work of Reception Room at police Station Kankroli Rajsamand. RajsamandPolice7Handed OverAdministrativeNew
138Constraction work of Reception Room at police Station Diwer Rajsamand. RajsamandPolice7Handed OverAdministrativeNew
139Constraction work of Reception Room at police Station Railmagra Rajsamand. RajsamandPolice7Handed OverAdministrativeNew
140Constraction work of of Kot No. 2 Commando School (RPTC)Jodhpur.JodhpurPolice45.61Handed OverAdministrativeNew
141Constraction work of Small target firing range for commando school (RPTC) District Jodhpur.JodhpurPHEDHanded OverAdministrativeNew
142Constraction work of Water tank in police line Jodhpur. JodhpurPoliceUnder ConstructionAdministrativeNew
Construction work of Police Station Chamu Jodhpur Rural.Jodhpur RuralPolice343.89AdministrativeNew
Construction work of Police Station Borunda Jodhpur Rural.Jodhpur RuralPolice343.89Under ConstructionAdministrativeNew
Construction work of Police Station Asop Jodhpur Rural.Jodhpur RuralPolice343.89Under ConstructionAdministrativeNew
Construction of Koth, Store and Armour Shop (Ground Floor) at 14th Battalion RAC PahadiBharatpurPolice320.14Under ConstructionAdministrativeNew
Construction of M.T. Shed Garage (Covered Parking) at 14th Bn RAC Pahadi.BharatpurPolice93.77Under ConstructionAdministrativeNew
Construction of MT Office, Workshop and Store at 14th Battalion RAC Pahadi.BharatpurPolice17.58Under ConstructionAdministrativeNew
Construction of sewer line and sewerage treatment plant at 14th Battalion RAC Pahadi.BharatpurPolice60Under ConstructionAdministrativeNew
14th Battalion RAC road and other development work in Pahadi. (Phase I)BharatpurPolice219.78Under ConstructionAdministrativeNew
Development of Water Supply Source in 14th Bn RAC Pahadi.BharatpurPolice60Handed OverAdministrativeNew
14th Bn RAC earthfilling work at Pahadi.BharatpurPolice177.98
Handed OverAdministrativeNew
Construction of Sentry post at 14th Battalion RAC Pahadi.BharatpurPolice7.33Under ConstructionAdministrativeNew
street light and transformer work at 14th Battalion RAC Pahadi.BharatpurPolice50Handed OverAdministrativeNew
Construction of a parade ground work at 14th Battalion RAC Pahadi.BharatpurPolice20Handed OverAdministrativeNew
143Constraction work of Interlocking tile work and Cutoff wall work on the main gate road of administrative block 14th RAC pahadi Bharatpur.BharatpurPolice424.23AdministrativeNew
144Constraction work of Plinth Conservation at 14th BN. Block C bharatpur District Bharatpur.BharatpurPolice551.94Handed OverAdministrativeNew
145Constraction work of Regional Forensic Laboratory District Bharatpur.BharatpurPolice2171.07Under ConstructionAdministrativeNew
146Constraction work of SITC R.O At 14th BN RAC Pahadi Bharatpur District Bharatpur.BharatpurPolice551.94CompletedAdministrativeNew
147Develoment of horsetrack in RPA Jaipur.JaipurPolice0.91AdministrativeNew
148Constraction work of Women Atrocities and Research cell in Additional Superident of police District Barmer.BarmerPolice91.18Under ConstructionAdministrativeNew
149Constraction work of Circle Office Banasur District Alwar.Alwar (kotputli-behror )Police91.18Under ConstructionAdministrativeNew
150Constraction work of Circle Office Lohawat District Jodhpur Rural.Jodhpur RuralPolice91.18AdministrativeNew
151Constraction work of Circle Office Nadbai District Bharatpur.BharatpurPolice91.18Under ConstructionAdministrativeNew
152Constraction work of Circle Office Aspur District Dungarpur.dungarpurPolice91.18AdministrativeNew
153Constraction work of Circle Office Panchpadra District Barmer.BarmerPolice91.18Under ConstructionAdministrativeNew
154Constraction work of Circle Office District Barmer.BarmerPolice91.18Under ConstructionAdministrativeNew
155Constraction work of SC/ST Cell in Deputy Superintendent of police District Barmer.BarmerPolice91.18Under ConstructionAdministrativeNew
Construction work of Police Station Dhanau Barmer.BarmerPolice343.89Under ConstructionAdministrativeNew
Construction work of Police Station Cyber ​​Thana Barmer.BarmerPolice250Under ConstructionAdministrativeNew
Construction work of administrative building of C.O. Office, Siwana.BarmerPolice91.25NIT 26/2024-25AdministrativeNew
156Constraction work of Assistant Commissione Bagru District Jaipur.Jaipur CPPolice91.18Under ConstructionAdministrativeNew
157Constraction work of police Station Maujmabad District Jaipur Rural.Jaipur RuralPolice343.89Under ConstructionAdministrativeNew
158Constraction work of police Station Raisar District Jaipur Rural.Jaipur RuralPolice343.89Under ConstructionAdministrativeNew
159Constraction work of police Station Bhabru(Virat nagar) District Jaipur .Jaipur RuralPolice343.89Work CompletedAdministrativeNew
Construction work of Police Station Jamwaramgarh Jaipur Rural.Jaipur RuralPolice343.89Under ConstructionAdministrativeNew
Construction work of Police Station Naraina Jaipur.Jaipur RuralPolice343.89Under ConstructionAdministrativeNew
Construction of Computer Room and Reception Hall at Police Station Kardhani, Police Commissionerate, Jaipur.JaipurPolice26.92Work is closed at present time
AdministrativeNew
Construction of Police outpost,JaipurJaipurPolice38Handed Over
AdministrativeNew
Construction of Police Outpost Goner, Police Commissionerate, JaipurJaipurPolice38Work is closed at present time
AdministrativeNew
Work of establishment of Indoor Shooting Range in Rajasthan Police Academy, Jaipur.Jaipur CPPolice1400Under ConstructionAdministrativeNew
160Constraction work of police Station Jhanpada District Dausa.DausaPolice343.89Under ConstructionAdministrativeNew
Construction work of Police Station Baswa District Dausa.DausaPolice343.89Under ConstructionAdministrativeNew
161Constraction work of police Station Bahatukalan District Alwar.AlwarPolice343.89AdministrativeNew
162canal water Security of detenation stationat bhadra and nohar Assembly Constituency District Hanumangarh.
HanumangarhPolice343.89Under ConstructionAdministrativeNew
163Constraction work of police Station Fefana at Hanumangarh.HanumangarhPolice343.89Under ConstructionAdministrativeNew
Construction work of Police Station Khuiya District Hanumangarh.HanumangarhPolice343.89Under ConstructionAdministrativeNew
164Constraction work of police station Khamera district Banswara.BanswaraPolice343.89AdministrativeNew
165Constraction work of police Station Sharthal district Baran.BaranPolice343.89Under ConstructionAdministrativeNew
Construction work of office building of Office of Additional Superintendent of Police, Anti-Corruption Bureau, Baran.BaranACB116.84AdministrativeNew
166Constraction work of police Mahila Thana district Tonk.TonkPolice315Under ConstructionAdministrativeNew
167Constraction work of police post Kahadwas(Buhana) district Jhunjhunu.JhunjhunuPolice82.23Under ConstructionAdministrativeNew
168Constraction work of 244 police post C-Sector Murlidhar Viyas nagar (naya sahar)district Bikaner.BikanerPolice82.23Work CompletedAdministrativeNew
169Constraction work of police post Chhanibadi district Hanumangarh.HanumangarhPolice82.23Under ConstructionAdministrativeNew
170Constraction work of police post Jhiri district Dholpur.DholpurPolice82.23Under ConstructionAdministrativeNew
171Constraction work of police Station Palai(Uniyara) district Tonk.TonkPolice82.23Under ConstructionAdministrativeNew
172Constraction work of police post Sekhala district Jodhpur Rural.Jodhpur RuralPolice82.23HandoverAdministrativeNew
173Constraction work of police post Bhakra district Barmer.BarmerPolice82.23Under ConstructionAdministrativeNew
Construction work of Police Station Patiya Udaipur.UdaipurPolice343.89Under ConstructionAdministrativeNew
Construction work of Police Station Kalyanpur Udaipur.UdaipurPolice343.89Work Order IssuedAdministrativeNew
174Constraction work of police post Bilakh district Udaipur.UdaipurPolice82.23AdministrativeNew
175Constraction work of police post Tokar district Udaipur.UdaipurPolice82.23Under ConstructionAdministrativeNew
176Constraction work of police post Sagwada district Udaipur.UdaipurPolice82.23Under ConstructionAdministrativeNew
177Constraction work of police post Bhanda district Udaipur.UdaipurPolice82.23AdministrativeNew
To develop Police Training School Khairwada as Institute of Jungle and Field Craft.
Works of sand model cum electric model and other equipment.
UdaipurPolice71Work completedDepositNew
Construction of Home Guard Training Centre Udaipur (Govardhan Vilas) Office.UdaipurPolice110Handed OverAdministrative
Internal and external electrical work in newly created Maharana Pratap RAC (IR) Battalion Hatunia PratapgarhPratapgarhPolice169.83Under ConstructionAdministrative
Construction work of Police Mahila Thana, District Pratapgarh.PratapgarhPolice315Under ConstructionAdministrativeNew
178Constraction work of police post Keshariabad district Pratapgarh.PratapgarhPolice82.23Land IssueAdministrativeNew
179Constraction work of police Chowki Peeth district Dungarpur.Dungarpur.Police82.23Under ConstructionAdministrativeNew
180Construction work of police post Mauthli chauraha district Dungarpur.DungarpurPolice82.23AdministrativeNew
Construction work of Police Station Sone Ka Gurja Dholpur.DholpurPolice343.89Under ConstructionAdministrativeNew
181Construction work of police post Sewar district Dholpur.DholpurPolice82.23Under ConstructionAdministrativeNew
182Construction work of police post bijoli district Dholpur.DholpurPolice82.23Under ConstructionAdministrativeNew
Construction work of Police Station Bishangarh District Jalore.JalorePolice343.89Work order issuedAdministrativeNew
183constraction work of Center of Cyber Crime investigation building and synthetic athletics track at police traning school,jodhpur.JaipurPolice1923.21Under ConstructionAdministrativeNew
184Construction of various work Light Connection, obslacle Connection, Water Connection, Class Room Size, Furniture for Class room, Sewerage at police training school,jodhpurJodhpurPolice223.35AdministrativeNew
Construction work of Police Station Raithal Bundi.Bundi.Police343.89Under ConstructionAdministrativeNew
Construction work of Police Station Deikheda Bundi.Bundi.Police343.89Under ConstructionAdministrativeNew
Construction work of Police Station Namana Bundi.Bundi.Police343.89Under ConstructionAdministrativeNew
Construction work of Police Station Karwar District Bundi.Bundi.Police343.89Under ConstructionAdministrativeNew
Construction and establishment of drill nursery at PTS Jodhpur.JodhpurPolice12.5Handed OverDepositNew
185Construction of man and woman barracks for 14th RAC at Pahadi, BharatpurBharatpurRAC823.95Handed OverResidentialNew
186Construction of 200 man barrack, 100 woman barrack, LSQ and USQ houses (105 houses) and residence of Commandant/Dy. Commandant at Police Training School, UdaipurUdaipurPolice3985.02Under ConstructionResidentialNew
187Construction of residential buildings at MP (IR) BN Pratapgarh.PratapgarhRAC518.20Handed OverResidentialNew
188Construction of 300 man barrack and 50 woman barrack at MP(IR) BN PratapgarhPratapgarhRAC1881.97CompletedResidentialNew
189Construction of 35 Lower Subordinate Residences in 7th Battalion Bharatpur Complex.BharatpurPolice546.00Under ConstructionResidentialNew
190Construction of CO residence in Mount Abu, District SirohiSirohiPolice53.19Re-tender has to be issued.ResidentialNew
191Construction of Upper Subordinate Residence in Mount Abu District SirohiSirohiPolice319.87Under ConstructionResidentialNew
192Construction of Lower Subordinate Residences in Mount Abu District SirohiSirohiPolice1237.73Land is being identified at another location.ResidentialNew
Construction work of 100 women barracks in Police Line Jhalawar.JhalawarPolice480Work Order IssuedResidentialNew
193Construction of 100 bed women barracks at Police Training School, Bikaner.BikanerPolice432.52Handed OverResidentialNew
194Residence First Type (1 no.) In Mewar Bhil Corps BanswaraBanswaraPolice67.86Work is closed at present time ResidentialNew
195Type-ll, Houses (3 Numbers)BanswaraPolice140.05Work is closed at present time ResidentialNew
196Upper Subordinate Quarters (6) MBC, BanswaraBanswaraPolice159.49Work is closed at present time ResidentialNew
197Lower Subordinate Quarters (32 Nos.) at MBC, BanswaraBanswaraPolice526.56Work is closed at present time ResidentialNew
198200 Man Barrack at MBC, BanswaraBanswaraPolice476.86Work is closed at present time ResidentialNew
199100 Man Barrack for MBC Banswara at RPL BanswaraBanswaraPolice903.53Work is closed at present time ResidentialNew
20050 Bedded Women barracks at MBC, BanswaraBanswaraPolice281.92Under ConstructionResidentialNew
201Construction work of two prisoner barricks of 83 prisoner capacity, work of lockers cupboard and construction work of new bathroom General item Puncture of main wall of Sub Jail Kishangarh Bass (Alwar).AlwarJail107.5Under ConstructionJailNew
202 Construction of two prisoner barracks with a capacity of 90 prisoners when there are 161 prisoners against the prisoner capacity of 55 in District Jail, Rajsamand.RajsamandJail90Work order IssuedJailNew
203Construction work of raising the ground floor and outer wall of sentinel line at High Security Jail, Ajmer.AjmerJail319.29Handed OverJailNew
204Construction work of 16 residential houses in open prison camp Barmer.BarmerJail146.76Handed OverJailNew
205Construction work of 16 residential houses Open Perison Camp Bundi.BundiJail146.76Under ConstructionJailNew
206Construction work of 16 residential houses Open Perison Camp AjmerAjmerJail146.76Handed OverJailNew
207Construction work of 80 capacity ground floor instead of 80 prisoner capacity (40 ground floor and 40 first floor) in District Jail Hanumangarh.HanumangarhJail255.1Under ConstructionJailNew
208 Construction work of 16 residential houses in open prison camp Baran.Baran Jail146.76Under ConstructionJailNew
209Construction work of 16 residential houses in open prison camp Pratapgarh.PratapgarhJail146.76Under ConstructionJailNew
210 Construction work of 12 residential houses in open Prison camp Chittorgarh.ChittorgarhJail110.07Under ConstructionJailNew
211 Construction work of 16 residential houses in open prison camp Pali.PaliJail146.76JailNew
212 District Jail Barmer(80 Ground Floor)BarmerJail274Under ConstructionJailNew
213 Central Jail Sri Ganganagar 80 (40 ground floor and 40 first floor)SriganganagarJail240Under ConstructionJailNew
214District Jail, Nagaur80 (40 ground floor and 40 first floor)NagaurJail229Under ConstructionjailNew
215 District Jail, Churu 160 (80 ground floor and 80 first floor) (General).ChuruJail432Under ConstructionjailNew
216 Construction of dining hall in District Jail, Dholpur.DholpurJail65.15Under ConstructionjailNew
217Central Jail Ajmer(Modernization of meeting rooms)AjmerJail17.9Handed OverjailNew
218 District Jail Tonk(Modernization of meeting rooms).TonkJail15.4Work order issuedjailNew
219Construction of reception room, meeting room of Central Jail, DholpurDholpurJail14.45Tender is to be issued.jailNew
220District Jail, Chittorgarh (Modernization of Visiting Rooms)Chittorgarh Jail14.04jailNew
221District Jail, Hanumangarh Item: (Modernization of visiting rooms)Hanumangarh Jail15.36HandoverjailNew
222Central Jail, Kota Item: (Construction of prisoner cells to keep dangerous prisoners separated).kotaJail78.14Under ConstructionjailNew
223District Jail, Churu Item: (Construction of prisoner cells to keep dangerous prisoners separated)ChuruJail91.5Under ConstructionjailNew
224District Jail, Jhunjhunu Item: (Construction of prisoner cells to keep dangerous prisoners separated)jhunjhunuJail77.2Under ConstructionjailNew
225 Construction of 02 watch towers at Central Jail Alwar.AlwarJail30.7jailNew
226Construction of Sub Jail building Aklera,JhalawarJail1053.00Handed OverjailNew
227Construction of District Jail DungarpurDungarpurJail1638.00Under ConstructionjailNew
228Construction of two under trial prisoner's barracks and Parkotwall at District jail BaranBaranJail225.46Handed OverjailNew
229Construction of two prisoner barracks of 111 prisoner capacity and main wall construction work in District Jail Jhunjhunu (Suometo)
Item: General item
JhunjhunuJail187.70Handed OverjailNew
230Construction of prisoners barrack at sub jail Rajgarh, Churu ChuruJail82.50Handed OverjailNew
231Construction of steel shutter without shelves lockers at Central Jail Ajmer, Bharatpur, Kota, Bikaner, AlwarJail95.00Handed OverjailNew
232Construction of 5 houses for prisoners in open jail DungarpurDungarpurJail42.98Work is closed at present time jailNew
233Construction of Video Conferencing Room at District Prison Sikar, Hanumangarh, Sawaimadhopur, Pali, Pratapgarh, High Security Prison Ajmer and Sub Prison Medtacity and Balotra (Suomoto)Jail70.006 Work Completed jailNew
234Construction of 01 watch towers at District Jail, Sirohi.SirohiJail15.35jailNew
235 Construction of 01 watch towers at District Jail, Jalore.JaloreJail15.35Under ConstructionjailNew
236Construction of 01 watch towers at District Jail, Barmer.BarmerJail15.35Under ConstructionjailNew
237Construction of 03 Watch Towers at District Jail, Hanumangarh.HanumangarhJail46.05Under ConstructionjailNew
238Construction of 02 Watch Towers at District Jail, Pratapgarh. PratapgarhJail30.7jailNew
239Construction of 02 watch towers at District Jail, Chittorgarh.ChittorgarhJail30.7Under ConstructionjailNew
240Construction of 02 watch towers at District Jail, Baran.Baran Jail30.7jailNew
241Construction of 02 watch towers at District Jail, JhalawaraJhalawar Jail30.7jailNew
242 Construction of (2 watch towers) at District Jail, Jhunjhunu.JhunjhunuJail30.7Under ConstructionjailNew
243Construction of ( 02 Watch Towers)at District Jail, Sikar.SikarJail30.7Work Completed.jailNew
244Construction of ( 01 watch towers) at District Jail, Nagaur.NagaurJail15.35HandoverjailNew
245District Jail, Sawai Madhopur (Construction of 01 Watch Towers).Sawai Madhopur Jail15.35Work Completed.jailNew
246Central Jail, Banswara (Construction of 02 Watch Towers).Banswara Jail30.7jailNew
247 Construction work of 32 residential houses in open prison camp Ajmer.AjmerJail310.07Under ConstructionjailNew
248 Construction work of 32 residential houses in open detention camp Bharatpur.Bharatpur310.07jailNew
249Construction work of 32 residential houses in open Prison camp Kota.KotaJail310.07jailNew
Detail Project Report and Consultancy services work for Shifting of Exiting Central jail kota, District jail Rajsamnd, Bhilwara and Pali Rajasthan.Jail28Work Order IssuedjailNew
250 Construction work of 32 residential houses in open prison camp Pali.PaliJail310.07Under ConstructionjailNew
251Construction work of 16 residential houses in Open Prison Camp (out of 208) Pratapgarh.PratapgarhJail155.03jailNew
253 Construction work of 16 residential houses in open prison camp Bundi.BundiJail155.03jailNew
254Construction work of 16 residential houses in open Prison camp Baran.Baran Jail155.03jailNew
255Construction work of 80 capacity barrack in Central Jail Bharatpur.BharatpurJail785jailNew
256Construction work of 80 capacity barracks (40 ground floor, 40 first floor) in Central Jail, Ajmer.AjmerJail397.5jailNew
257Construction work of 80 capacity barrack in Central Jail, Alwar.AlwarJail196Under ConstructionjailNew
258 Construction work of 80 capacity barrack in Central Jail, Jodhpur.JodhpurJail196jailNew
259 Construction work of 80 capacity barracks (40 ground floor, 40 first floor) in District Jail Sikar.SikarJail192work order has been issuedjailNew
260 Construction work of 80 capacity barrack in District Jail Bikaner.BikanerJail196work order has been issuedjailNew
District Jail, Sawaimadhopur.(Construction of 01 Watch Towers) Item: GeneralSawaimadhopurJail15.35Handed OverjailNew
261Construction work of 80 capacity barrack in District Jail Tonk.TonkJail196jailNew
262 Construction work of 80 capacity barracks with manwall in High Jail Sanchore District Jalore.JaloreJail367jailNew
263 Construction work of 80 capacity barrack in District Jail Baran.Baran Jail196jailNew
264 Construction work of 27 residential houses in open Jail camp Sanganer.jaipurJail200Under ConstructionjailNew
271Construction of 100 man barrack at Police Line Police Commissionerate, JaipurJaipurPolice300.00Handed OverResidentialNew
272Construction of training Hostel at SDRF GadotaJaipurSDRF365.00Handed OverResidentialNew
273Construction of 2 barracks (100 Man) at SDRF GadotaJaipurSDRF400.00Handed OverResidentialNew
274Barrack Construction at Police line JaipurJaipurPolice500.00Handed OverResidentialNew
275Construction of residence of Assistant Commissioner of Police, ChomuJaipurPolice43.00Handed OverResidentialNew
276Construction of 16 LSQ houses at RAC 5th BN, Transport NagarJaipurRAC400.50Handed OverResidentialNew
277Construction of 06 LSQ houses at PS KaladeraJaipurPolice133.50Handed OverResidentialNew
278Construction of 06 LSQ houses at PS Pratap NagarJaipurPolice133.50Handed OverResidentialNew
279Construction of 06 LSQ houses at PS BassiJaipurPolice133.50Handed OverResidentialNew
280Construction of 12 LSQ houses at PS SanganerJaipurPolice267.00Handed OverResidentialNew
281Construction of 4 USQ and 16 LSQ houses at PS ShivdaspuraJaipurPolice489.08Handed OverResidentialNew
282Construction of 4 USQ and 16 LSQ houses at PS KotkhavdaJaipurPolice489.08Handed OverResidentialNew
283Electrical Maintenance work in Residential buildings from Block 'A' to 'L' located in RPA Campus Jaipur.JaipurPolice35.80Handed OverResidentialRepair & Maintenance
Construction of training hostel in SDRF at the place of 100 man-1 which will have 2 single rooms, 6 double seated rooms, 6 four seated rooms with attached let bath and dormitory of 24 capacity.JaipurPolice365Handed OverResidentialNew
Construction work of new hostel of 300 capacity for women assistant sub-inspectors at Rajasthan Police Academy, Jaipur.Jaipur1239.67Under ConstructionResidentialNew
Work of shaheed Memorial at Home Guard Headquarters Campus Begus Jaipur.Jaipur24.45Handed OverResidentialNew
Construction of 100
Man Barrack at 14th Bn. RAC Pahadi Bharatpur.(Construction of complete barrack on ground floor)
Bharatpur Police551.94Handed OverResidentialNew
Construction of 50 bed female barrack (ground floor and first floor) at 14th Battalion RAC Pahadi Bharatpur.Bharatpur Police272.01Handed OverResidentialNew
Construction of residences for Commandant and Assistant Commandant 7th Battalion, Bharatpur.BharatpurPolice100Handed OverResidentialNew
Construction of 35 Lower Subordinate Houses at 7th Battalion Bharatpur Campus.Bharatpur Police546Under ConstructionResidentialNew
284Construction work of 200 man barrack and 50 capacity women barrack in Police Line (Kotputli Bahrod).Alwar (Kotputali Bahror)Police1083Under ConstructionResidentialCSS
285Construction work of 200 man barrack and 50 capacity women barrack in Police Line (Deeg).DeegPolice1083Under ConstructionResidentialCSS
286Construction work of 200 man barrack and 50 capacity women barrack in Police Line (Commissionerate Chandpole Jaipur).JaipurPolice1083Under ConstructionAdministrativeCSS
287Construction work of 200 man barrack and 50 capacity women barrack in 13th Battalion RAC, Jail Security Complex, Jaipur.JaipurJail922Under ConstructionResidentialCSS
288.Construction work of 100 man barrack, 25 capacity barrack with 01 first type residential building in PTS, Bharatpur institute campus.Bharatpur Police575Under ConstructionResidentialCSS
289.Construction work of 12 upper and 36 lower subordinate residential buildings in Police Line, Kotputli Behror.Alwar (Kotputli Behror)Police1456Under ConstructionResidentialCSS
290.Construction work of 12 upper and 36 lower subordinate residential buildings in Police Line Beawar.BeawarPolice1456Work has not yet startedResidentialCSS
291.Construction work of 12 upper and 36 lower subordinate residential buildings in Police Line, Deeg.DeegPolice1456Under ConstructionResidentialCSS
292.Construction work of 12 upper and 48 lower subordinate residential buildings at 13th Battalion RAC, Jail Security Complex (Fatehpura) Jaipur.JaipurJail1788Under ConstructionResidentialCSS
293.Construction work of 36 upper and 114 lower subordinate residential buildings in CID (CB) and RPA premises in Police Line Jaipur Rural.Jaipur Rural.Police4533Under ConstructionResidentialCSS
294.Construction work of 12 upper and 48 lower subordinate residential buildings in Police Line (Sri Ganganagar).Sri Ganganagar.Police1788Under ConstructionResidentialCSS
295.Construction work of 06 upper and 48 lower subordinate residential buildings in Police Line (Bharatpur).BharatpurPolice1559Under ConstructionResidentialCSS
296.Construction work of 36 upper and 96 lower subordinate residential buildings in Police Line (Kota city/rural).Kota Police4034Under ConstructionResidentialCSS